Aft heads update

We now have our Natures Head composting toilet in the aft heads compartment. New floor fitted. All needs sanding and painting, then we can add basin and holding tank to be able to move onwards.

When we get onto the grp work to fill the seacocks I’ll also tidy up the end of the stringer just to the left of the loo.

Due to us prioritising the length of the middle of the aft cabin double bed the infill is a bit longer than before. So when the double bed is made the door to the heads does not open as far. That meant we were going to be scraping ourselves on the door handle. So I’ve removed it. Will need to find a different solution to hold it closed (we don’t need a lock).

One thought on “Aft heads update

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.