The epoxy inside the galley had dried enough. So Jane got to paint everything that will be visible under and over the worktop. Will need more coats and eventually above the worktop will have a splashback and some storage (we don’t want it to be boxed in as much as it was before, this feels far more spacious).


Meanwhile I was getting stuck in the aft locker (lazarette). The goal was to remove some of the timber that had been used for the gas bottles, plus fit some insulation to keep our feet a bit warmer in bed (we have had some condensation onto the mattress/sheet/duvet). So managed to fit 20mm of closed cell foam insulation. Will see if it helps.
That locker is was clearly not designed for adults to get to the far corners 😭 It could do with some paint and one day we will need to fit windvane steering supports to it. It think that will be Jane’s job!



