Aft cabin more progress

We’re got all the ply backing to the headlining down also the cupboards as they were blocking access and we couldn’t insulate them to stop condensation. Managed to remove the vinyl that was stuck to the sides. Have uncovered all the bolts we need access to.

Now we have painted the whole cabin, wanted to feel that it was clean and protected from damp behind the insulation that will be the next job (tomorrow when the paint has properly dried.

We’ve got the fan heater on whenever we are not cooking (else we trip the circuit breaker). So hoping to be dry and odour free for sleeping tonight (8 hours at 20°C).

One thought on “Aft cabin more progress

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.