Today was beautiful weather and we were able to get the last coat of paint on both masts (at least for the moment) m

We are not in a rush now to get the masts up. There is nothing to be gained by putting them up in the boatyard for the winter.
We still have a lot to do anyway in terms of chainplates, fittings on the masts, dyneema standing rigging, wiring, lights, wind sensor, aerials, running rigging. None of this will be improved by 6 months of autumn, winter and spring outside in the boatyard.
So most of these jobs can wait until the couple of months before we launch. Until then we can do a lot of preparation (such as mast tangs and splicing) plus ordering everything we will need.