Check out our new video
We get our first stanchion base ready to fit. Making more progress towards carbon-fibre stanchions with fully sealed decks.
Also progress on the galley painting, insulation, worktops, fiddles and more. A complete replacement of the original 47 year old galley.
Oh, and we fixed some leaks in the deck.
Our Stanchion Design follows what we learned from @Tulasendlesssummer in @ • DIY CARBON FIBER STANCHIONS
Our free Sustainable Sailing book is at: https://sustainablesailing.codeberg.page/
If you would like to support us then we have memberships or donations on Ko-Fi! at https://ko-fi.com/sustainablesailing/ (apart from a small card processing % we get all your support which is much better value than Patreon).
Or visit our shop at https://sustainablesailing.teemill.com/ for great hoodies, t-shirts and bags.
We are refitting a 1977 Rival 38 for a Sustainable Sailing retirement starting in Summer 2025. When we bought Vida in August 2019 she was in a very tired and damp condition with all original equipment and fittings (much of it not working). We have removed all the gas, diesel and paraffin equipment, and are installing all-electric (motor, cooking etc). More detail on our blog at https://sustainablesailing.net/
Socials:
Faceboook: https://www.facebook.com/SustainSailing/
Mastodon: https://mas.to/@SustainableSailing
Leave a comment