Preparing for Friday progress

Wales have now lifted the restrictions on day visits. So in the morning we will be heading for Vida. First time since 21st March.

We are taking the motor frame.

I’ve slipped the motor out. 4 bolts each end of the motor attaching it to the frame. 3 frame bolts undone and 2 loosened was all it took.

It did mean I was able to check the weight of the completed frame. 21kg plus the two cross bars that will rest on the flexible mounts.

So we have got the motor frame and saloon cushions all loaded ready for the morning 😊

Hopefully there will be a Friday progress post tomorrow!

One thought on “Preparing for Friday progress

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

This site uses Akismet to reduce spam. Learn how your comment data is processed.